 Term Contract for the Repair, Alteration, Addition and Improvement Work of Electrical Installations in The Hong Kong Academy for Performing Arts (3/2018 to 2/2019) |  Hong Kong Museum of Art - Electrical Installation |  Replacement of Air Conditioning System at Pak Sha Wan Correctional Institution (Package 1) (Contract No. 1290EM13M) |  Lai Chi Kok Park Sports Centre, Kowloon |  Princess Margaret Hospital - 7/F Library, Block G, Kwai Chung, N.T. |  Refuse Collection Point and Transit Nursery, Baptist University Road, Kowloon |